This site requires Get Adobe Flash Player.

GBMSD operates two wastewater treatment plants

 
GBMSD's Green Bay facility is located on the mouth of the Fox River.  The daily maximum capacity is 49 million gallons per day (mgd).  The Green Bay facility's daily average is 30 mgd.  The facility has 82 regular full time employees.
GBMSD's De Pere facility is located just north of the De Pere dam on the Fox River.  The daily maximum capacity is 14.2 million gallons per day (mgd).  The De Pere facility's daily average is 8 mgd.  The facility operates with 16 employees.


©2010 Green Bay Metropolitan Sewerage District created using: buildmyownsite.com